The PACCAR Center for Applied Science is attached to the east side of the Bollier Center for Integrated Science and Engineering, and sits directly south of the Herak Center for Engineering and is connected by a sky bridge.
This 25,000-square-foot facility features sophisticated technological laboratories, including the Smart Antenna and Radio Laboratory and the Avista Transmission & Distribution Power Laboratory.
Gonzaga's first building awarded LEED Gold certification, PACCAR opened in 2008. This "green" building also houses administrative offices and multi-media classrooms.
Inside PACCAR
Key:
P Printer
E Elevator
W Women's Restrooms
M Men's Restrooms
Note: Entrance on Floor 1
PACCAR Lower Level
PACCAR Floor 1
PACCAR Floor 2
PC 206 - First Year Advisor Joan Sarles
PC 211 - More about the Dean's Office